A). Prevent malfunction or relatively low reliability of an object with emergency measures prepared in advance;
B). If a system malfunctions or is destroyed, compensation can be provided by measures prepared in advance;
C). Make "cushions" which allow small changes in the system without harm to other parts;
D). Make parameters of the system to be regulated, adjustable;
E). Make the system adaptable.
(Also named "Cushion in Advance")
The opposite:
A).
This is the Method 42 [11] | Index